PRODUCTION TIMELINE: 8 WEEKS (UNLESS SPECIFIED)

0

Your Cart is Empty

MATTEO - EXPRESS POST

Size Guide
Size
1 item ready to ship (more can be made)

PRODUCTION TIMELINE: 8 WEEKS (UNLESS SPECIFIED)

22037-MATTEO-MUSHROOM  Also available in Navy

A handsome male dance shirt with long sleeves and lycra/mesh splicing designed to match girl's design' 'Blaise'.  New Mushroom colour looks great when teamed with dancer's own tan or black trousers.

 


GET ON THE LIST

Size Chart
x